Nagykörút: What is planned for the tree lines on Budapest’s Grand Boulevard

When we view apartments with clients in inner Pest, the tour often ends at the Grand Boulevard. Teréz körút, Erzsébet körút, József körút, Ferenc körút: historic buildings on both sides, tram 4 and tram 6 in the middle. Between them, the avenues that once stood here are to return.
At the end of September 2026, BKK published permit-ready plans for exactly these tree lines. They cover the stretch between Nyugati tér and Boráros tér — the corridor where many of the apartments we work with sit.
Where the project stands
Aim. The city is planning more shade, better conditions for pedestrians and cyclists, and active ground floors along the boulevard. Mayor Karácsony put it this way in February: prepare the district for heat and for the 21st century.
On the table. Permit plans for the avenues, BKK, 30 September 2026. Before that, on 20 February, the city’s action plan: pavements, trees, ground floors. The city then named around HUF 10 billion as the frame for this public space. BKK has already secured EU funds for cycling, walking and shop deliveries (around HUF 4.5 billion) and expects a further tranche if the next call succeeds.
Site walks in October. Over the year BKK held forums and walks. Tree surveyors were on site in early October at four points:
- 7 October, District IX, Angyal István park
- 8 October, District VIII, Corvin köz / József körút
- 13 October, District VII, Erzsébet körút 53
- 14 October, District VI, Nyugati tér at the fountain
Next. For owners, the permit, the tender and the construction programme come next. That includes how trams 4 and 6 are to run while work is under way.
What the greening plan sets out
Along the stretch the city counts around 600 trees. The existing stock stays in place for construction reasons. For every tree that has to be replaced on health grounds, at least three new plantings are planned: one on the same spot, the others at other points on the boulevard, including where there is a gap today. The replacement rate is to stay under ten percent; dozens of trees will get targeted work so they can keep growing.
The city treats this as infrastructure: shade, evaporation, rain that soaks in on site. Utilities are to be moved so the roots have real room. The pattern is already visible at Blaha Lujza tér.
In the existing rows, species that fit the streetscape stay. In the new rows, climate-adapted species are to be added. Which variety stands in front of which house number is in the plans shown on the walks.
The visualisations are by BKK; image rights BKK.



What this means for an apartment on the boulevard
Trams 4 and 6 remain the spine. BKK still calls the line one of the most heavily used tram routes, on the order of a hundred thousand passengers a day. Cycle lanes and pavements are to become safer and greener. The plans do not provide for permanent parking along the carriageway edge.
If you view an apartment on the boulevard, it is worth looking at the street in front of the building as well: trees, pavements and how the ground floors are used are part of the location. For apartments already let, it also matters when and for how long work will take place in front of the house. The concrete construction timetable is still to come.
The city wants to bring the ground floors and the protected façades along: small businesses, culture, a shared presence under the name “Neonfényes Körút”. That concerns owners who hold shop units.
Money
The February action plan speaks of about HUF 10 billion for the public space in this project. EU funds for cycling, walking and shop deliveries have already been secured. Whether the second tranche (HUF 5.5 billion in the coverage) arrives depends on the next call.
Whether the boulevard later runs through the new joint development role of the regional BKK — state and city fifty-fifty — will be decided in the next rounds of the Fővárosi Közfejlesztések Tanács.



